Aeroterm NE Cargo Phase III
Single-tenant cargo handling facility including 122,637 SF of warehouse and 8,225 SF of mezzanine office space built on a 12-acre site, with the ability to provide ramp space for two Group 6 wide-body aircrafts. Additional scope of work included the extension of taxi lane NN, as well as a landslide access road. Extensive site work with removal of PFAS-contaminated soil was required, in addition to utility relocation and additional site access roads. Heavy coordination with the FAA and CDA was required, as the project relocated the boundary of an airside security fence to create a landside access space to the new facility.
WBE Participation
Jobs Created
35%
13%
City of Chicago Residents
Local Hire Participation
51%
$42M
MBE Participation
Total Budget